Document text
Machine-read from the scan, so expect some errors. Lines that couldn’t be read are left out.
Page 1
199% HOLMES & NARVER, INC. To: Project Enfjineerin2’File/ Job: Stations at (1) Wotho, (2) Identification No. Item (1) - 19600 1-30-57 and 1-28-S7 may be seen in Project Engineer Files. Copies of same will be transmitted to Jobsite. Description of Work The issue of this En&ineerin& Order authorizes the above action addressees to prepare separate plan sets, separate cost estimates and construction time schedules for rehabilitation of each of the Rad-Safe Stations at Sites Wotho, Ujelang md Utirikj all in accordance with requirements outlined in Paragraphs 6 and 7 of reference confidential let’ter(A) dated February 11, 1957, as modified b~ reference letter ‘(B),corrected with Plans and cost estimates will be forwarded to Hone Office Estimating Department for Reference Letter (B) is quoted as follows: lIYOU are hereby authorized to desi~n and prepare estimates for Weather and Rad-Safe Stations as requested in JTF-7 letter dated February 11, 1957” l!Estimtes should be pre~ared for each single location for both the new stations and the rehabilitation of existin~ stations as fundin~ for this project has not been definitely determined. offered as follows: 7-L.. Tanks for potable water are to be fabricated of non-corrosive material.
Page 2
2. The plan for the four new weather stations is to be based on the Tarawa plan, with minor exceptions, namely: a. Move antennas so that not more than 1~01 of drop-lead to the Operations Euilding No. 5 is necessary. The antenna can be directly over the building - b. llovethe latrine from the barracks bu”ildingto the day room and provide a shed for laundry facilities. These instructions su~ersede the desi&n requirements for weather stations in para~raph 3 of JTF-7 ietter. The Rad-Safe Station is still to be similar to 3. ~Le~iew the &en(?ratOr capacity at the existing stations to ascertain if it is sufficient to carry the additional load of the ice makin~ machine’and electric “ grill requested in parasraph 7 of JTF-7 letter. If larger Generators are required make provisions in your estimate. llTherefore,you are requested to prepare an estimated construction schedule which will show the number of days required after notification Tel~type reference (C) is quoted as follows: ~lHOHNERT()SANDERS INFO KT COL WALTER A GRAY. REF MY LTR of availability of funds.!! REQUESTED CGIVIFLETIC)NDATE DISREGARD FIRST SENTENCE OF NEXT TO LAST PAR.AAm ALL OF LAST PARA OF LTR. PROVISIONS hiLL BE MAIE FCR FUNJING OF CONST IN FY 1958 EULZET NOW UNDER PREPPLRATION. (For Distribution, see Page 3)
The text continues in the original scan (3 pages).