DocJax

Declassified record · U.S. Department of Energy

Memo to W E Nervik, Subject: Eniwetok Sample Analytical Program - Progress Report No. 12

Dated
Jul 16, 1973
Document type
Correspondence
Length
5 pages
Open the original scanArchive record OSTI ID 16022966 · public domain

Document text

Machine-read from the scan, so expect some errors. Lines that couldn’t be read are left out.

Page 1

Nervik, Division Leader, Radf.ochemistry Enlwetok sample analytical program. Progress Repofi No. u. Status as of 13 July 1973. This progress report summarizes the laboratory analytical effort being carried on at LLL by members of the Radiochemistry Division, Biomedical Division, and Hazards Control Department, at the University of Leventhal, Mr. William Major), and at Eberline Instrument CorporaEric Geiger, Mr. Ernest Sanchez). Initial processing. All efforts completed as of 29 June 1973. sediment, and core samples: Initial processing efforts at LIZ have been ccznpletedas of 15 June. We have revised our bookkeeping on numbers of samples processed in Building 412. Revised totals are as follows: The sediment and core samples were collected from the lagoon floor. University of California

Page 2

Fish samples (Ml samples to be processed; breakdown - 407 fish, 28 seawater filters, 3 al.g=j 2 sedtientt 1 coral): Initial processing phase at UW, Seattle, complete as of Dried samples subsequently Terrestrial animals, eggs, etc. (281 Seawater (58 samples collected): samples to be processed): 281 samples ccxnpletedas of Chemical separation (ILL) - initial separation chemistry Initial processing completed on the following samples prior to Air Filters (61 samples). 11. Gamma counting, precision Ge(Li) detector Samples counted and data in computer Animals, birds, eggs, etc. 77 * Parentheses indicates categories where gamma counting has been completed.

Page 3

111. Chemical analyses, samples dissolved and elements isolated As of 13 July 1973, the status of sample delive~ to contract labs is the following: begun in December 1972. 15 June 1973 29 June 1973 13 July 1973 _ .: Data reported on 9osr 1041 X215 1318

Page 4

Environmental hmsis Laboratory (II%) - The analytical work at 15 June 1973 29 June 1973 13 July 1973 Water plant residues 2

Page 5

was begun on April 2, 1973. Samples received - soils 326 Fu data reported 220 University of Washington ~< !,,r- All samples have been ashed as Preliminary data have been reported by letter (22 W’S, 7 Sr’s, 24 Fets). Cmnputer card format has been received by UW and data cards shouldbe forthcoming. Data reported columns till reflect data reported as final data on A progress report will be issued every two weeks.