Archive description
Current costs at the Mound Laboratory are tabulated for the month ending June 30, 1954. Costs are broken down by program and equipment categories and split in three categories: engineering design and inspection, direct costs, and indirect costs.
Document text
The text of this scan hasn't been read yet. Open the original to read it.