Document text
Machine-read from the scan, so expect some errors. Lines that couldn’t be read are left out.
Page 1
. The General Manager has requested that.the attached memorandum ““i of February ’14,1969 from the Assistant General Manager for Military ..:! Application, with a copy of the Memorandum of Understandings:be::’‘;”+.l;: Exec. Asst. to GM Asst. GM for Admn. Asst. GM for MA Asst. GM for Operations
Page 3
Urn undeveloped islands on short noticae, at minimum demaxid$upon outside ““’ ‘ re$ouroes, in manner similar to that which would be re@%kl iiisupport
Page 4
‘contractor,and to defray transportation, mint axy travel, per diem, fid other assoa$ated costs attributable to the task ad not included under’” payments to the contractor. Zt is expected that the same procedures will be followed In respect to the $700,000 expected to be forthcoming in FY 70 from the Department of Interior. teclkal staff support and labor for cleanup as well caa’cimpsupper t’”””,, operations and other tasks as determined by the Project Manager. Except “ #or matters pertaining to contract administration, operational control over the contractor. Centract be performed by the AEC Honolulu area o$fice. 6. The AECWI1l be responsible for determining that radiolo@cal health and safety requlrqments are met at the completion of this project. These requirements, as developed in project plans, will be subject to
Page 5
7. The handling and removal of contaminated scrap will be conducted,.~,..’ .... .. so that esqxsures to personnei will be within tho standards for workers established by the Federal Radiation Council. ‘>,. The contractor will use Trust Territory island natives as feasible and as determined between the :. Project Manager and the Trust Territory xwpresentative. Trust Territory native zwsidents may not be employed in collecting and mmovlng contaxdnated ? 8.’ Equipment or other assets available to the AEC and DOD may be usad providing this arrangement is in the best interest of the U. SGovernment. If mutually agzwed between the providing party,’andthe ~ Project Managerp these assets will be made available to the Bikini cleanup project, ,atno cost other than for transportation, operating, and ,, 9. The Bikini cle~up will not interfere significantly with mati~” tenance of the test readiness posture. 10. The Director, DASA as Project Manager will act for the AEC h .,’ accordance with the provisions of this memorandum. Vice Admiral, USN for Milltary Application