Interim Record of Decision for Oak Ridge National Laboratory Waste Area Grouping 13, Cesium Plots, Oak Ridge, Tennessee

Dated
Sep 30, 1992
Document type
Conference
Length
37 pages
Open the original scanArchive record OSTI ID 16294873 · public domain

Document text

Machine-read from the scan, so expect some errors. Lines that couldn’t be read are left out.

Page 1

Interim Record of Decision for Oak Ridge National Laboratory Waste Area Grouping 13 Oak Ridge, Tennessee

Page 2

Interim Record of Decision for Oak Ridge National Laboratory Waste Area Grouping 13 orrk Ridge, Tennessee Office of Environmental Restoration and Waste Management 120 South Jefferson Circle Oak Ridge, Tennessee 37830 under Contract No. DE-AC05-900R21851

Page 3

TABLE OF CONTENTS SITE NAME AND LOCATION ............................ STATEMENT OF BASIS AND PURPOSE ..................... ASSESSMENT OF THE SITE .............................DESCRrrmON OF SELECTED REMEDY .................... 1-2 SITE NAME. LOCATION. AND DESCRIPTION SITE HISTORY AND ENFORCEMENT ACTIVITES HIGHLIGHTS OF COMMUNITY PARTICIPATION .............. SCOPE AND ROLE OF THE RESPONSE ACTION ............... SUMMARY OF SITE CHARACTERISTICS .................... SUMMARY OF SITE RISKS ............................. 2-6 DESCRIPTION OF ALTERNATIVES ........................ 2-7 Waste Management Facility ......................... 2-8 Overall Protection of Human Health and the Environment ........ 2-10 Regulatory Agency Acceptance ......................... 2-12 The Selected Remedy .............................. 2-12 Protection of Human Health and the Environment ............. 2-13 Alternative 3-Excavation and Storage at a Currently Operating Alternative 4-Excavation and Disposal at the WAG 6 Low-Level SUMMARY OF COMPARATIVE ANALYSIS OF ALTERNATIVES .... 2-9

Page 4

Use of Permanent Solutions and Alternative Treatment Preference for Treatment ............................ 2-15 EXPLANATION OF SIGNIFICANT CHANGES ................. 2-16 PART 3 . RESPONSIVENESS SUMMARY ........................... 3-1 Summary of Comments Received and Agency Responses ......... 3-2 Background on Community Involvement ................... Appendix A. MEETING MINUTES AND LETER OF RESPONSE

Page 5

as low as reasonably achievable applicable or relevant and appropriate requirement Comprehensive Environmental Response, Compensation, Md Liability Act Code of Federal Regulations U.S. Department of Energy Interim Record of Decision operation and maintenance Oak Ridge National Laboratory Oak Ridge Reservation picocuries per gram reasonable maximum exposure Tennessee State Route to be considered Tennessee Code Annotated Tennessee Department of Environment and Conservation Waste Area Grouping

Page 7

SITE NAME AND LOCATION Waste Area Grouping (WAG) 13 Oak Ridge National Laboratory (ORNL) Oak Ridge Reservation (ORR) Oak Ridge, Tennessee mATEMENT OF BASIS AND PURPOSE This decision document presents the selected interim remedial adon for the ORNL WAG 13 in Oak Ridge, Tennessee. This action was chosen h accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986, and, to the extent practicable, the National Oil and Hazardous Substances Pollution Contingency Plan. This decision is based on the administrative record file for this site. The State of Tennessee and the U.S.Environmental Protection Agency (EPA) concur with this interim action for the WAG 13 remediation. ASSESSMENT OF THE SITE Actual or threatened releases of hazardous substances from this site, if not addressed by implementing the response action selected in this Interim Record of Decision (ROD), may present a current or potential threat to public health, welfare, or the environment. DESCRIPTION OF SELECTED REMEDY The purpose of this interim action is to reduce the risk to human health and the environment resulting from current elevated levels of gamma radiation on the site and at areas accessible to 'the public and adjacent to the site. To achieve this, only the cesium-contaminated soil within the plot will be addressed. This is not the final action planned for WAG 13. Subsequent actions are planned to,fully address the remaining threats posed by the conditions at the site. As mandated in CERCLA, the site will be evaluated during the Remedial Investigation

Page 8

The major components of the interim action remedy are the following: excavate cesium-contaminated soil until residual contamination is containerize the excavated soil in steel boxes designed for the storage of transport the excavated soil to WAG 6 low-level waste silos by truck; and line eacb excavated plot with a permeable liner and backfill with a clean compacted fill material and a topsoil layer. Intexim remedial action on WAG 13 prior to completion of the RI/FS will provide additional benefits consistent with the goals of CERCLA, including: preventing a known source of cesium-contaminated sediment from producing elevated levels of gamma radiation on WAG 13 and to areas accessible to the reducing further degradation to the environment by eliminating the source of reducing the difficulty and risk associated with future surveillance, maintenance, and remedial activities on WAG 13. This interim action protects human health and the environment, complies with federal and state applicable or relevant and appropriate requirements (ARARs) for this limited-scope action, and is cost-effective. This action is interim and is not intended to use permanent solutions and alternative treatment (or resource recovery) technologies to the maximum extent practicable, given the limited scope of the action. Again, this action is not a final remedy for the WAG. Therefore, the statutory preference for remedies that employ treatment that reduces toxicity, mobility, or volume as a principal element will be addressed at the time of the final response action. Subsequent actions are planned to fully address the remaining threats posed by the site. B e u s e this is an IROD, review of this WAG and of this remedy will be continuing as part of the development of the final remedy for the site.

Page 9

Oak Ridge Field Mice Director, DOE Oversight DivH Date State of Tennessee Tennessee Deparunent of Environment and Conservation

Page 11

SITE NAME, LOCATION, AND DESCRIlPIlON WAG 13 is part of ORNL on the ORR CERCLA Site in mane County, Tennessee. ORNL is part of the federally owned ORR, managed for DOE by Martin Marietta Energy Systems, Inc. The WAG 13 cesium plots are in an approximately &acre grassy field 330!Inorth of the Clinch River at mile 20.5 and 1.3 miles south of the intersection of Bethel Valley Road and Tennessee State Route (SR) 95 (Fig. 1). The WAG 13 cesium plots are enclosed by a perimeter fence approximately loo0 ft by 250 ft. There are eight treatment plots that were used for a simulated nuclear weapons fallout study undertaken by ORNL. Each plot is 33 by 33 ft and is fenced with sheet metal extending 18 in. below the surface and 24 in. above surface. There are no other structures on the site. The elevated gamma radiation levels emitted from these plots pose a potential threat to human health and the environment. SITE HI!STORY AND ENFORCEMENT ACTIVITIES In August 1968, to simulate conditions of a nuclear fallout, four of the treatment plots (Nos. 2, 4,6,and 7) were contaminated (seeded) with 13'Cs; the remaining four plots were used as uncontaminated controls (Fig. 2). The seeding was achieved by spreading 13'Cs-fused sand particles evenly over the plots at 72 g/m2. Each test plot received 2.2 Ci of '"Cs, while the control plots received none. A surface radiological investigation was conducted at and around the site between June 1987 and March 1988 by ORNL's Measurement and Development Group (Yalcintas et al. 1988). Outside the fenced area, radiation levels were measured at 23 locations on the Clinch River and 9 locations along the riverbank. Radiation levels were also measured inside the fenced area. The summary of site characteristics section in this IROD provides more details regarding radiation On December 21, 1989, the ORR was placed on CERCLA's National Priorities List, which mandates specific requirements that environmental restoration activities must follow. DOE must also operate in compliance with the National Environmental Policy Act. An Interim Remedial Measures Study (Radian July 1992) for the WAG 13 cesium plots was completed in July 1992 to determine the best alternative for reducing the health threat posed by the gamma radiation in the plots.

Page 12

I RADlAN Locdion of the WAO 13 cosium Environmental Rertormtion Program I Fig. 1

Page 13

I RADIAN WAQ 13 rho map rhowing tho EnvironmonW Rostoration Program I Fig. 2

Page 14

HIGHLIGHTS OF COMMUNITY PARTICIPATION The Proposed Plan for the ORNL WAG 13 Interim Remedial Action was released to the public in July 1992. The Proposed Plan was made available to the public in the ndminiztrative record maintained at the Information Resource Center in Oak Ridge, Tennessee. Notice of availability for the Proposed Plan was published in the Oak Ridger on July 10,12, rrnd 15,1992; in the Kirarvillc News-Sentinel on July 10, 12, and 15, 1992; and in the RoMt Corrnty News on July 13, 15, and 17, 1992. A public comment period was held from July 14 to August 12, 1992. A public meeting was not scheduled, but opportunity for a meeting was offered in the published notice of availability. A response to the comments received during the comment period is included in the Responsiveness Summary, which is Part 3 of this IROD. This decision document presents the selected interim remedial action for the ORNL WAG 13 cesium plots. This selection was made in accordance with CERCLA, as amended by the Superfund Amendments and Reauthorization Act of 1986, and to the extent feasible, the National Contingency Plan. SCOPE AND ROLE OF THE RESPONSE ACTION The goal of this response action is to reduce the risk to human health and the environment resulting from the current elevated levels of gamma radiation on WAG 13. During this interim action, only the cesiumcontaminated soil within the plots will be addressed. Excavating these soils and placing them in WAG 6 low-level waste silos will prevent a known source of cesiumcontaminated sediment from producing elevated levels of g h n a radiation on WAG 13. Subsequent actions under CERCLA are planned to fully address the threats posed by the remaining exposure pathways at the site. These may include, but are not limited to, the soil outside the plot boundaries, the soil beneath the depth of excavations completed during the interim action, groundwater, and surface water. The remaining areas of the site will be evaluated during the RI/FS, as mandated in CERCLA. This interim remedial action is consistent with planned future activities at the site. In particular, this interim action will provide a reduction in the difficulty and risk associated with future surveillance, maintenance, and remedial activities.

Page 15

SUMMARY OF SITE CHARACIERISIICS Contamination on WAG 13 has resulted solely from the intentional deposition of 07Cs for the purpose of gaining knowledge of the effects of nuclear fallout. A total of 8.8 Ci was spread over the four test plots and has decayed to 5.1 Ci as of June 1992. The surface radiological investigation conducted at the site concluded that the maximum exposure to the public would be approximately 0.019 mwh along the shoreline closest to the '"Cs plots and up to 0.150 mRh at the perimeter fence. Gamma ray exposure rates measured at plot plot boundaries within the fenced area ranged from 1.3 to 35 mwh (Yalcintas et al. 1988). Soil samples taken within the plots indicate that the 13Tshas been detected above 1 pCi/g (detection limit) at depths up to 3 ft. SUMMARY OF SITE RISKS A preliminary health risk assessment study was conducted for WAG 13 and the only contaminant of concern was determined to be 137Cs(Radian July 1992). Cesium-137 is a beta emitter (512 KeV) that also releases gamma at 661 KeV and has a 30-year half-life. Although 1987 soil samples from two locations between the contaminated plots and the nearby creek bed show that lnCs contamination has migrated (ORNL 1988)- the scope of this action is limited to contamination in the test plots. Therefore, the risk analysis does not consider possible contributions from I3'Cs that may have migrated beyond the test plots. External exposure to ionizing radiation poses the majority of risk to the exposed populations and was determined to be the dominant pathway of concern for all three scenarios. The exposure scenarios examined in the preliminary health risk assessment were: a worker who mows the area, a fishermanhater on the Clinch River who comes within 150 ft of the cesium a future on-site homesteader who lives inside the area that is currently fenced. Lifetime cancer risks associated with the WAG 13 cesium plots were calculated assuming reasonable maximum occupational exposure for the worker mowing the area, reasonable maximum exposure @ME) for a fishermadboater on the Clinch River, and RME for an on-site homesteader. Rh4E assumptions for the preliminary health risk assessment were adopted from

Page 16

The RME scenario for the worker assumes that an individual spends 25 hiyear on-site for 25 years and is exposed to an average gamma rate of 150 pRh measured on-site. The RME scenario for the fisherman/boater assumes that an individual spends 52 hiyear (1h/week) on the Clinch River near the WAG 13 cesium plots for 30 years and is exposed to a maximum gamma rate of 19 pR/h measured on the Clinch River. The RME scenario for the future on-site homesteader assumes that an individual spends 5600 h/year (16h/d for 350 d) for 30 years inside the fence and is exposed to an average gamma rate of 4 mWh. The risk to the worker was estimated to be 1 x lo’(1 in lo00 chances of developing cancer). The risk to the fisherman/boater on the Clinch River was estimated to be 2 X lo’, and risk to the on-site homesteader was calculated to be 3 x l@’. Calculated risks from lifetime exposure to radionuclides and chemicals were compared to the EPA’s target risk range of 1 x 106 to 1 x 1W. Any risk values greater than 1 x 104 (1in 10,OOO chances of developing cancer) are unacceptable, and any risk values less than 1 x lob (1 in l,OOO,OOO chances of developing cancer) are acceptable by EPA. Acceptance of risks The risk to the fishermanhater falls within EPA’s acceptable risk range. Although exposure to the worker is within DOE guidelines (DOE Order 5480.1 l), risks to the worker mowing around the cesium plots and to the on-site homesteader exceed EPA’s target risk range. Ecological risk to plants and animals has not been quantitatively analyzed, but removal or shielding of the contaminated soil will have a positive benefit for all risk scenarios. The WAG 13 area will need further evaluation for the CERCLA Ecological Risk Assessment and Natural Resource Damage Assessment during the RI. If no interim remedial action is taken, actual or threatened releases of hazardous substances from the WAG 13 cesium plots may present a current or potential threat to public health, welfare, or the environment. DESCRIPTION OF ALTERNATIVES This section provides a description of how each alternative would address the contamination found at WAG 13. Four alternatives are presented. These alternatives are not intended to remediate the entire WAG 13 site. Rather, they are intended to reduce the threat to human health, and to reduce further degradation of the environment resulting from elevated gamma radiation exposures. Remediation of the entire site will be addressed in future CERCLA

Page 17

CERCLA requires that the no-action alternative be evaluated to serve as a baseline for comparison at each site. Under this alternative, no further action would be taka to reduce the risk to human receptors from the current elevated levels of gamma radiation. Implementing this alternative would involve no additional costs. Shielding involves placing reinforced concrete boxes over each cesium plot. The boxes will deflect and contain the gamma radiation within the box. After shield installation, gamma radiation exposure rates will be reduced to 9 p w h at the perimeter fence, thus reducing risk to the general public on or near the Clinch …