DocJax

Declassified record · U.S. Department of Energy

Letter to Director's Office, Oak Ridge National Laboratory, Subject: Work Authorization: "electromagnetic Field Research Activities at Oak Ridge National Laboratory". (Encl.)

Dated
Mar 8, 1993
Document type
Correspondence
Length
5 pages
Open the original scanArchive record OSTI ID 16294845 · public domain

Document text

Machine-read from the scan, so expect some errors. Lines that couldn’t be read are left out.

Page 1

hparrrnent oi Energy 33k Ridge iield Office Martin Marietta Energy Systems, Inc. Post Office Box 2008 Oak Ridge, Tennessee 37831-6255 Enclosed is Work Authorization No. AK/04403/0R/40, Revision 01 for the Department of Energy Conservation and Renewable Energy Office of Utilities Technologies. This authorization provides hnding in the amount of $8,000 during the period February 1, 1993, t o September 30, 1993, contingent upon receipt of the funds in an approved financial plan. All work shall be conducted in accordance with departmental standards for environment, safety, and health and comply with the requirements of the National Environmental Policy Act. The work performed under this authorization shall be in accordance with Section 13 on the enclosed work authorization and attachment. Please return the original signed form to me. Also, please provide copies of the signed form to J. M. Penry, FM-72, OR; the Research in Progress Program If you should have any questions, please contact me a t (615) 574-9273. When replying, please refer t o 93-9440. Fusion and Nuclear Technology Branch Paul Gailey, ORNL LOG NC.

Page 2

U.S. DEPARTMENT OF ENERGY Management and Operating(nw)Contract Work Authorization 2. PROJECT TITLE : Elect roma q ne tic Field Research Activities at Oak Ridue 3. RESPONSIBLE ASSISTANT SECRETARY: Conservation and Renewable Eneruv k . RESPONSIBLE OPERATIONS OFFICE : Oak Rida e ODe rations 5 . ME0 CONTRACTOR NAME: Martin Marietta Eneray Systems 6. UORK AUTHORIZATION NO.: A h / 0 4 40 3/OR/40 7. ' REVISION NO.: 01 8. FUNDS HEREBY AUTHORIZED 9. PERFORMANCE PERIOD COVERED BY FUNDS FROM: 2/01/93 TO: 9/30/93 I O . UORK START DATE: 2/01/93 11. EXPECTED COMPLETION DATE: TBD 13. UORK AUTHORIZED: (Brief description, schedule, results or products, and reporting requi remcnts, and any shifting of funds permitted within the work authorization) : Funding provided under this authorizations hall be for Oak Ridge National Laboratory (ORNL) to continue to conduct research on biological effects and engineering issues related to exposure to Transmission Line frequency electric and magnetic fields. Quarterly Reports and a yearly review of technical progress are required. NAME E SIGNATURE DATE

Page 3

REACTOR OPERATIONS DIVISION, ER-12 II Barry Will ls / JeanS tid ham 4-8643/4-8646 I I 1 ACTION DUE DATE.

Page 4

United States Government Department of Energy FY 1993 Funding for the Oak Ridge National Laboratory in Support Of the Office of Energy Management's Field Effects Research Program Oak Ridge r'ield Office to continue work on Biological and Engineering research related tothe to be applied to the continuation of research on biological effects and engineering issues related to exposure to transmission line frequency electric and magnetic fields. The work is expected to be conducted in accordance with Departmental standards for environment,safety, and health, and t o comply with the requirements of the National Environmental Policy Act (NEPA). The Headquarters contact € or this authorization is Dr. Imre Gyuk (202 586-1482) and the Laboratory Manager for the work covered is Mr.Paul Office of Energy Management Conservation and Renewable Energy P. Gail ey, ORNL

Page 5

U.S. DEPARTMENT OF ENERGY Management and Operating (MM)) Contract Work Authorization NAME & SIGNATURE ORGANIZATION CODE 3. RESPONSIBLE ASSISTANT SECRETARY: Conservation and Renewable Enerqv 4 . RESPONSIBLE OPERATIONS OFFICE : Oak Ridqe Operations 5. M&O CONTRACTOR NAME: Martin Marietta Enersv Svstems 6 . WORK AUTHORIZATION NO.: AK/04 4 0 3/OR/40 7. REVISION NO.: 01 8. FUNDS HEREBY AUTHORIZED 9. PERFORMANCE PERIOD COVERED BY FUNDS FROM: 2 / 0 1 / 9 3 TO: 9 / 3 0 / 9 3 11. EXPECTED COMPLETION DATE: TBD 13. WORK AUTHORIZED: (Brief description, schedule, results or products, and reporting requirements, and any shifting of funds permitted within the work authorization) : Funding provided under this authorization shall be for Oak Ridge National Laboratory (ORNL) to continue to conduct research on biological effects and engineering issues related to exposure to Transmission Line frequency electric and magnetic fields. Quarterly Reports and a yearly review of technical progress are required. 15. OPERATIONS OFFICE OFFICIAL :